Scope of Work
Durability Inspections, Pressure Washing, Vapor Blasting, Structural Repair, Continuing Service Agreement
Industry Sector
Municipal
Project Highlights
Interior Structural Rehabilitation of three lower flumes, Temporary Handrail Addition, Vapor Blasting Surface Preparation, WireMesh and Anchor Installation, Substrate Tensile Testing, Structural Lining/Curing with SikaRepair 224.
CROM Structural Rehabilitation
CROM provided interior structural rehabilitation of three lower flumes for a large water treatment plant*. The client was impressed with the value-added service and performance on the job, including being completed in a safe, timely, and efficient manner.