CROM: Essential Partner for St. Johns County’s Largest Capital Improvement Project
St. Johns County is one of the fastest-growing counties in Northeast Florida. Its wastewater system needed both additional capacity and a path to comply with a state law requiring Florida utilities to eliminate non-beneficial surface water discharges by January 1, 2032.
The county’s answer was the SR 207 Water Reclamation Facility, a $191.8 million program that stands as the largest capital improvement project in county history. Located west of I-95 at 3055 State Road 207 in Elkton, the facility treats 3.25 million gallons per day (MGD) and is designed to expand to 6.5 MGD as demand grows. In addition to regulatory compliance, the project diverts flow away from the Anastasia Island water reclamation facility—a barrier-island plant vulnerable to storm events—and is projected to keep more than one million pounds of nitrogen and phosphorus out of the Matanzas River over the next 20 years. The facility came online May 11, 2026.
The county delivered the project through a Progressive Design-Build contract with Jacobs, which ran design and construction in parallel to accelerate the schedule. Jacobs selected CROM as its subcontractor for the plant’s wire-wound prestressed concrete structures. CROM’s scope covered design calculations, sealed shop drawings, and complete construction of seven structures spanning nearly every process step at the plant. Each tank was engineered to its own process and site requirements rather than to a single template.
With CROM’s proven technology and forward-thinking design, St. Johns County produces reclaimed water for irrigation, conserves drinking water supplies, and protects the Floridan Aquifer today and for decades to come.
| Structure | Capacity | Dimensions | Configuration |
|---|---|---|---|
| Reclaimed water storage (2) | 4,500,000 gal each | 181'-0" ID x 23'-6" SWD | Domed |
| Reject water storage | 3,414,000 gal | 154'-0" ID x 24'-6" SWD | Open top |
| Aerobic sludge holding | 575,000 gal | 70'-0" ID x 20'-0" SWD | Open top |
| Clarifiers (2) | 1,000,000 gal each | 100'-0" ID x 18'-6" SWD | Open top |
| Offsite reclaimed water storage | 2,000,000 gal | 125'-0" ID x 21'-10" SWD | Domed |
The State Road 207 Water Reclamation Facility by the Numbers
Million
Largest capital improvement project in St. Johns County history.
Facility
Providing critical wastewater treatment infrastructure.
Crom Tanks
7 prestressed concrete tanks, 6 on site and one off site.
Million
Gallons per day of initial treatment capacity.
Reclaimed Water
Produced for irrigation and other non-potable uses.
Pounds
Estimated nutrient pollution prevented from entering the Matanzas River over the next 20 years.