Chattanooga, Tennessee | Wastewater Storage Tanks

An Overflow of Collaboration Keeps Wastewater Contained

Client:

City of Chattanooga

Location:

Chattanooga, Tennessee

Delivery Type:

Design/Build

Job Type:

New Build

Partner:

Brasfield & Gorrie, JDS, Jacobs, Barge Design Solutions, Croy Engineering, Terracon Consultants

Three water treatment tanks. Built by CROM for Chattanooga's e2i2 project.

CROM Tanks Capture and Store Wastewater During Heavy Rainfall

CROM is a key partner in Chattanooga’s largest design-build water infrastructure initiative, known as the e2i2 (Environmental and Economic Infrastructure Improvements) Project. An element of “Clear Chattanooga,” the city’s sewer overflow abatement program, e2i2 is designed to capture and store excess wastewater during heavy rainfall events to mitigate sewer overflows, improve regional environmental quality and accommodate the city’s future growth and development.

Million Gallons
Olympic Sized Pools

Tanks Total

CROM designed and built three prestressed concrete tanks across two jobs sites—two tanks in west Chattanooga and one in South Lee Highway. Combined, the tanks will hold 40 million gallons of wet-weather wastewater–enough to fill more than 60 Olympic-size swimming pools.

The e2i2 Project leverages CROM’s progressive design-build model, which brings design and construction teams together to develop the solution collaboratively rather than completing design in isolation before construction begins.

The construction phase of the project began in 2025, with structural completion targeted for March 2027 and full operation expected by June 2027.

An Infographic breaking down the e2i2 project by the numbers.